Hardware store mezzanine, Nonthaburi (sample)
A 4.8 m building gained 1,200 m² of storage with a steel mezzanine.
1,200 m²extra floor area
500 kgper m²
25days to install
What we did
Designed a 500 kg/m² steel mezzanine with stairs, guardrails and a goods lift. Installed in 25 days.